NCL Industries Q2 FY27 Earnings Call — Analysis (NSE: NCLIND)
Q2 revenue grew 12% as cement volumes strengthened, but higher fuel costs and subdued pricing compressed EBITDA margin to 9.64%; NCL also committed to a ₹987 Cr renewable project that will lift leverage.
Result quality: stable — Results context unavailable. Management sentiment: optimistic.
The take
Q2FY27 Revenue from operations ₹386 Cr ( +12% YoY; +12% QoQ YoY ) . New guidance — Q4FY28 tuticorin 130 mw hybrid renewab… 130 megawatts . New story: Renewable capex and leverage .
Results
Q2 revenue ₹386 Cr +12% YoY; EBITDA ₹37 Cr -26% and margin 9.64% (-502bps); PAT ₹20 Cr +1%.
Financial highlights
| Metric | Value | Change | Basis |
|---|---|---|---|
| Revenue from operations | ₹386 Cr | +12% YoY; +12% QoQ | yoy · Q2FY27 · Management also stated 12% growth QoQ. |
| EBITDA | ₹37 Cr | -26% YoY; -6% QoQ | yoy · Q2FY27 · Management also stated a 6% decline QoQ. |
| EBITDA margin | 9.64% | -502bps YoY; -189bps sequentially | yoy · Q2FY27 · Management also stated a 189bps sequential contraction. |
| Profit after tax | ₹20 Cr | +1% YoY; +15% QoQ | yoy · Q2FY27 · Management also stated 15% growth QoQ. |
| PAT margin | 5.18% | -60bps YoY; +12bps sequentially | yoy · Q2FY27 · Management also stated a 12bps sequential increase. |
| Revenue from operations | ₹730 Cr | +7% YoY | yoy · H1FY27 |
| EBITDA | ₹77 Cr | -25% YoY | yoy · H1FY27 |
| EBITDA margin | 10.53% | -453bps YoY | yoy · H1FY27 |
| Profit after tax | ₹37 Cr | -7.2% YoY | yoy · H1FY27 |
| Cement sales volume | 14.59 lakh tons | +1.96 lakh tons vs 12.63 lakh tons | yoy · H1FY27 · Management gave both half-year volumes; it did not state a percentage growth rate. |
| Cement EBITDA per ton | ₹480 per ton | none · Q2FY27 | |
| Cement EBITDA | ₹38 Cr | none · Q2FY27 | |
| Cement EBITDA | ₹74 Cr | none · H1FY27 | |
| Bison Panel EBITDA margin | 14% | none · Q2FY27 · Management stated the same margin for H1FY27. | |
| Bison Panel EBITDA | ₹5 Cr | none · Q2FY27 | |
| Bison Panel EBITDA | Nearly ₹10 Cr | none · H1FY27 · Management described the amount as close to ₹10 Cr. | |
| RMC EBITDA | ₹1 Cr | none · Q2FY27 | |
| RMC EBITDA | ₹1.47 Cr | none · H1FY27 | |
| Energy division EBITDA | ₹0.63 Cr | none · H1FY27 | |
| Net worth | ₹969 Cr | point_in_time · September 30, 2026 · As of September 30, 2026. |
Guidance
The 130 MW hybrid renewable project is targeted for commissioning by March 2028, with approximately 40% of generated power intended for captive use.
What management committed to
- The 130 MW Tuticorin hybrid solar-wind project is expected to be commissioned by March 2028. — 130 megawatts, Q4FY28
- The 130 MW Tuticorin hybrid renewable project entails an aggregate investment of approximately INR 987 crores. — approximately INR 987 crores
- Approximately 40% of the power generated by the Tuticorin hybrid renewable project will be utilized for captive consumption. — Approximately 40%
- The Tuticorin hybrid renewable project will be funded 70% through debt, with the balance funded through internal accruals. — 70%
- Upon implementation of the Tuticorin renewable project, NCL Industries' debt-to-equity ratio is expected to increase from 0.26 to approximately 0.9. — approximately 0.9, Upon implementation of this project
- The Tuticorin renewable project is expected to generate approximately INR 70 crores of annual power-cost savings. — INR 70 crores per annum, per annum
- The Tuticorin renewable project is expected to have a return on equity of around 10%. — Around 10%
- For FY27, cement EBITDA per ton should not be more than INR 550. — INR 550, FY27
- Cement EBITDA per ton is expected to improve by INR 50–60 in H2 from the H1 level. — INR 50-60, H2FY27
- Bison Panel margins are likely to improve in the coming periods because of higher sales volumes. — in the coming periods
- Bison Panel utilization is likely to improve in the coming periods. — in the coming periods
Key themes
Renewable capex amid margin pressure
How the narrative shifted
- Renewable capex and leverage: Management presents a large hybrid renewable investment as a route to lower power costs, support future expansion, and strengthen energy security, while acknowledging materially higher leverage.
- Cement growth versus cost pressure: Management reported resilient cement volumes and healthy Q2 demand but said subdued pricing and rising coal and fuel costs compressed margins.
- Premium cement positioning: Management attributes above-regional utilization and pricing power to Nagarjuna Cement’s premium brand position in Andhra Pradesh and Telangana.
- Bison affordability and reach: NCL is lowering Bison Panel prices and increasing advertising to address affordability, broaden market penetration, and counter duplicate products.
- Odisha market expansion: Management sees an opportunity to expand cement operations in Odisha, pointing to limited integrated capacity, but says the proposed plant remains at a preliminary stage.
- RMC competitive pressure: RMC remains challenged by manpower availability and intense competition from the unorganized sector, contributing to lower H1 volumes.
Operational commentary
- The board approved phases 2 and 3 of the Tuticorin hybrid renewable project, taking planned capacity to 130 MW and aggregate investment to approximately ₹987 Cr; 70% of project cost is expected to be debt-funded and the debt-to-equity ratio is expected to rise to approximately 0.9.
- Cement capacity utilization was 79% in Q2 and 74% in H1 based on expanded capacity. Management attributed stronger cement volumes to housing and infrastructure demand and said Nagarjuna Cement commands a ₹5–₹10 per tonne premium in Andhra Pradesh and Telangana.
- NCL acquired Vishwamber Cements Ltd, including a 322-acre limestone mining lease, to strengthen raw-material security and backward integration.
- Management is exploring a cement plant in Odisha; the proposal is preliminary and subject to evaluation and approvals. The Vizag grinding unit was at 77% utilization and its products had been launched in Odisha.
- Bison Panel cut selling prices by approximately 17%–20% and launched advertising to improve affordability, strengthen brand reach, and address duplicate products sold under the brand name; its dealer network reached 343 in H1FY27.
- RMC H1 volumes declined amid manpower constraints and intense competition from the unorganized sector.
- The two canal-based hydropower plants generated no electricity in Q1 because of water unavailability, then generated 9.22 million units in Q2.
Analyst Q&A
Q. Why did the renewable project cost rise, and what are its funding, captive-use, and sale assumptions?
The cost increased by ₹68 Cr because the project now includes domestic solar panels under government stipulations. Management said 70% would be debt-funded, with ₹675 Cr sanctioned by HDFC Bank and ICICI Bank, and about 40% of power would be used captively.
Q. What generation, savings, and return should investors expect from the renewable project?
Management described savings of ₹3 per unit on captive power, sales revenue of about ₹4 per unit for surplus power, an annual saving estimate of about ₹70 Cr, and project ROE of around 10%; it did not provide a single reconciled generation or return calculation.
Q. Why invest in the full renewable project upfront rather than only the captive-use portion or in stages?
Management cited the 130 MW grid allocation, transmission-line and substation requirements, and the view that staging the project would not be viable; it also said future cement expansion could use more of the power.
Q. When will the renewable project be commissioned, and will it be phased?
Management said it aims to complete the total project by March 2028, aligned with Power Grid readiness, and expects to execute the capacity together rather than in installments.
Q. What is the outlook for cement EBITDA per ton, board margins, and board utilization?
Management expected H2 cement EBITDA per ton to improve by ₹50–₹60 from H1, said FY27 should not exceed about ₹550 per ton, and said board margins and utilization could improve with higher volumes; board utilization was about 60%.
Q. What EPC contractor will build the renewable project, and what protections exist against cost overruns or generation shortfalls?
Management said it had not awarded an EPC contract, would source materials directly, and would use contractors for execution; it cited an internal team and land already in its possession but did not specify guarantees or cost-overrun protections.
Q. Why not conduct a share buyback instead of funding the renewable project?
Management defended the project on the basis of future power-cost savings, revenue contribution, and future expansion needs, but did not directly address the buyback proposal.
Q. Is the proposed Odisha cement project justified given regional capacity utilization and competition?
Management said the same belt may not warrant more capacity, but argued that smaller plants have exited and that Odisha has relatively few integrated cement plants.
Research and educational content only. Not investment advice.